Recently, DaTongLongYuan received exciting news: in the bid for the boiler pulverizing system optimization & efficiency upgrade project at Suralaya Power Plant under Indonesia’s state-owned PLN IP Group, we—together with our strategic partner Beijing Power Equipment General Plant—defeated long-established German and Japanese mill manufacturers. This marks the first time a Chinese brand has replaced Western, Japanese, and Korean brands in Indonesia’s power sector, especially breaking the precedent of Chinese brands supplanting original OEMs in non-Chinese EPC power projects.
This victory is the strongest proof of DaTongLongYuan’s capabilities.Confronting formidable domestic and international competitors—especially veteran German and Japanese firms—we secured the win on two decisive strengths:
01 Cutting-edge Technology, Solid Confidence
Our tailor-made technical solution, developed specifically for this project, exceeds international benchmarks in wear resistance and operational efficiency. Tangible technological superiority earned the owner’s recognition and became our core confidence in defeating foreign brands.
02 High-Efficiency Team, Synergetic Success
From early-stage intelligence gathering and iterative proposal refinement to poised on-site presentations, every department worked seamlessly with rapid response and professional execution, showcasing DaTongLongYuan’s formidable team power.
PLN IP Group specialists conducting an on-site inspection at our Indonesia office
Signing ceremony between DaTongLongYuan and Beijing Power Equipment General Plant
This milestone is more than a highlight in DaTongLongYuan’s history; it is a major breakthrough for Chinese pulverizer brands in the international optimization & efficiency-upgrade segment.
Moving forward, we will carry this honor and responsibility to deliver the project with excellence, further proving the strength of Chinese brands on the global stage!